GAMMASPHERE/FMA @ ANL
ANL, January 2000, GSFMA90 crew
ANL, May 1998
ANL, May 1998
ANL, May 1998
ANL, May 1998
GammaSphere installed and operational at ANL, Jan 1998
(Photo by Todd Brown)
GammaSphere installed and operational at ANL, Jan 1998
(Photo by Todd Brown)
GammaSphere installed and operational at ANL, Jan 1998
(Photo by Todd Brown)
First HemiSphere being installed at ANL, late September 1997
First HemiSphere being installed at ANL, late September 1997
The last truck out of LBNL, September 1997
The last truck out of LBNL, September 1997
The last truck out of LBNL, September 1997
One Shell is empty, September 1997
Moving GAMMASPHERE to ANL, September 1997
GAMMASPHERE detectors in a crate, September 1997
The GAMMASPHERE Platform in front of the FMA, August 1997
The GAMMASPHERE beam-line in front of the FMA, June 1997
Visit the FMA home page for
more information on the Fragment Mass Analyzer